(21/01/2026 20:09)507022 Wrote:  Given the amount of works required in such a tight space and no major possessions proposed for 2026 for that route, I think even 2028 is very optimistic.
The logical time to do it would be with the link line slab track renewal but that’s not happening any time soon.

Where about does the slab track renewal need to take place, between what stations?
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(23/03/2026 22:09)508134 Wrote:  Where about does the slab track renewal need to take place, between what stations?

In the underground from Leeds St to St James Old station, I believe
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
One of the Ormskirk to Hunts Cross circuits has been operating as an 8 Car Tuesday, Wednesday and Thursday this week, commencing the start of the Selective Door Operation on the 777 fleet. 777016 & 041 ran this circuit Tue and Wed. 011 & 021 on Thursday. Unfortunately, the 8 car unit had to be pulled from service mid afternoon on both Wed and Thur as I understand due to a fault with the doors.
From what I witnessed when I took a trip to Hunts Cross and back, announcements on board train, both audio and on display, very clear of the set-up, which affects Cressington station in both directions (1 unit set of doors wont open), St Michaels towards Hunts Cross (rear door won't open) and Aigburth towards Liverpool (rear door won't open). There is also an information poster, attached below, regarding the situation at Cressington displayed at the station.
No sign of the return of Hunts Cross to Southport running any time soon.